This paper addresses the solution of the Medium-Term Operation Planning (MTOP) problem. This operation scheduling problem aims to define the output of each power plant to minimize the expected production cost over a medium-term planning horizon. In hydrothermal systems, the MTOP is strongly influenced by the amount of water inflow to the reservoirs of hydroelectric plants, which is uncertain. Thus, the System Operator (SO) must consider these uncertainties in the problem resolution, which can be solved by means of Stochastic Programming (SP) techniques, such as the Progressive Hedging (PH) proposed in this paper. This paper presents suitable decomposition schemes to reduce the CPU time, such that it is possible to use a detailed model for the problem. Additionally, a parallel computational approach based on the PH algorithm is also implemented. To demonstrate the efficiency of the proposed schemes, a large hydrothermal system is investigated in the case studies.

► We applied the Progressive Hedging algorithm to Operation Planning Problem. ► We propose an alternative decomposition scheme to get lower CPU time. ► We compared the CPU performance between two decomposition schemes. ► Besides, we also study PH features in order to improve the convergence process. ► We also implemented a parallel computational approach via PH.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,