Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
705164 | Electric Power Systems Research | 2012 | 9 Pages |
In this article we investigate how to optimally activate regulating bids to handle bottlenecks in power system operation. This will lead to an optimal stopping problem, and activation of a regulating bid is to be performed when the transfer through a specific system bottleneck reaches a certain value. Compared to previous research in the area the work presented in this article includes a more detailed model of the structure of the regulating market, and reaction times of actors on the regulating market is taken into consideration. The emphasis of the presentation will be application to a two area test system. The method is compared to Monte Carlo simulation in a numerical example. The example shows a promising result for the suggested method.
► Power system frequency control. ► Activation of regulating bids. ► Maintaining secure operation. ► Defining transmission limits.