Article ID Journal Published Year Pages File Type
705288 Electric Power Systems Research 2008 11 Pages PDF
Abstract

A yearly multi-round, multi-period, multi-product transmission rights (TR) auction issuing both point-to-point Financial Transmission Rights (FTRs) and Flow-Gate Rights (FGRs) is studied in this paper. In each round the TR market participants (buyers or sellers) submit their bid or offer prices based on past energy market performance. A Locational Marginal Pricing (LMP) based energy market is assumed. The TR market participants’ bid or offer prices reflect their expectation of the average annual LMP differences between withdrawal and injections points for FTRs and of the transmission link capacity prices for FGRs. The TR auction is performed in four rounds; in each round 25% of the entire system capability is awarded. TRs that are awarded in one round are modeled as fixed injections in subsequent rounds. Market participants that have acquired TRs in one round can sell them in subsequent rounds. A market participant can submit bids or offers for on-peak, off-peak or 24-h TRs. A three-area, nine-bus test system with six TR market participants is used for the analysis of the TR auction.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, ,