Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
705859 | Electric Power Systems Research | 2016 | 6 Pages |
Abstract
The reliability of an electrical power system is influenced by the operation of circuit-breaker (CB). A good indicator of circuit-breaker condition is its switching time. Based on it some of the critical circuit-breaker irregularities can be detected and removed before they develop to a failure. In this paper, the evaluation of time measurements (timings) in case of different failures will be carried out for two circuit-breaker solutions, i.e. with spring and hydraulic drive. Moreover, the relationships between switching time and failure type/location will be derived. Thereby, the influence of failure trend will also be taken into account.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Bartosz Rusek, Gerd Balzer, Martin Holstein, Max-Steffen Claessens,