Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
706993 | The Electricity Journal | 2008 | 10 Pages |
Abstract
The cost burden of new large-scale transmission projects is exacerbated when low-capacity-factor generation, such as wind and solar, requires new dedicated lines. Solar PV at sufficiently large scale avoids expensive incremental transmission because it can be located at the load center.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Edward Kahn,