Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
707282 | The Electricity Journal | 2009 | 10 Pages |
Abstract
Last September, the Macau government issued a Public Consultation Paper proposing the introduction of competition into generation and transmission. An analysis suggests that fully adopting this proposal may lead to less-reliable service without the compensating benefits of lower costs and rates.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
C.K. Woo, Ira Horowitz, Asher Tishler,