Article ID Journal Published Year Pages File Type
7084389 Bioresource Technology 2013 7 Pages PDF
Abstract
► A hybrid reactor was studied for its application to denitrification of wastewaters. ► Microbial granules developed in the reactor within 15 day of reactor start-up. ► Complete nitrate removal was possible at 740 g NO3-N/m3 day loading at an HRT of 6 h. ► Complete denitrification resulted at a COD/NO3-N ratio as low as 2.2. ► Denitrification efficiency was more than 95% on industrial wastewater.
Related Topics
Physical Sciences and Engineering Chemical Engineering Process Chemistry and Technology
Authors
, , ,