Article ID Journal Published Year Pages File Type
7088333 Bioresource Technology 2012 4 Pages PDF
Abstract
► Cost-effective silver recovery with a rate as high as 99.92% was achieved. ► A maximum power of about 4.25 W/m2 with a fill factor of 0.626 was achieved. ► Both silver metal and electric energy were produced at a rate of 69.9 kg silver per KWh energy output.
Related Topics
Physical Sciences and Engineering Chemical Engineering Process Chemistry and Technology
Authors
, ,