Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
709778 | IFAC Proceedings Volumes | 2012 | 6 Pages |
Abstract
The paper deals with the production scheduling optimization in High-Mix Low-Volume (HMLV) flow shop manufacturing system. Three new heuristic production scheduling algorithms balancing the machines assignment to the production orders are proposed. The goal of the algorithms is to find a production schedule that minimizes the total production time of the set of jobs - makespan. An example case study, where the proposed scheduling algorithms are verified and compared with basic solutions using the simulation model of the HMLV manufacturing system created in Witness simulation software, is presented.
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics