Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
709822 | IFAC Proceedings Volumes | 2012 | 6 Pages |
Abstract
In this paper, we study flexible mixed model assembly lines with serially connected stages where stages may have one or more parallel stations. Station parallelism in flexible mixed model assembly lines improves system reliability and enables rapid adaptability to customer demand fluctuations. In this paper we consider task assignment, model and task scheduling problems simultaneously. Due to its success in solving combinatorial problems, we develop a Constraint Programming model for the problem and test its performance using various size instances. The results reveal that, the model outperforms a Mixed Integer Programming model and a decomposition scheme given in the literature.
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics