Abstract
The start-up time of a combined-cycle power plant depends mainly on the heat recovery steam generator (HRSG) with its thick-walled tubes. This work contributes to a start-up time reduction of a large combined-cycle power plant (CCPP) with a supplementary-fired HRSG. Hence, a dynamic simulation model is developed using the advanced process simulation software (APROS). The flue gas path and the water/steam side are modelled in detail. All control structures required for the plant operation are implemented, e.g. drum, steam turbine bypass system and steam temperature control. The comparison between model predictions and design data at different load changes shows high correlation towards given data with an average relative error of 5%. Using the developed model, hot, warm and cold start-ups are simulated and finally three different reduced start-up times of gas turbine (15â¯min, 24â¯min and 38â¯min) are evaluated. A comparison between baseline and improved start-ups reveals time saving and fast power generation rate.
Keywords
Start-up proceduresBFPMAXEVAECOCRHAttemperatorCCPPHRSGfeed watereconomizerSelectorSelectReheaterMaximumevaporatorLoad changeAttemptSteam turbineGas turbineMemoryMinSuperheaterDynamic simulationHigh-pressureLow-pressureMEMHeat recovery steam generatorCombined cycle power plantAPROSSelective catalytic reductionMinimumProportional-Integral controllerFlue gasSCR
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Process Chemistry and Technology
Authors
Falah Alobaid,