Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
7113484 | The Electricity Journal | 2017 | 8 Pages |
Abstract
A reform of the Western Energy Imbalance Market should target the right problem. Import leakage is a problem; resource shuffling is a solution. Proposed modifications for the existing EIM design target the wrong problem and would work at cross purposes to the very reasons for the EIM's existence. There is a better approach that would address the right problem and preserve the critical elements of the existing EIM design.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
William W. Hogan,