Article ID Journal Published Year Pages File Type
7113484 The Electricity Journal 2017 8 Pages PDF
Abstract
A reform of the Western Energy Imbalance Market should target the right problem. Import leakage is a problem; resource shuffling is a solution. Proposed modifications for the existing EIM design target the wrong problem and would work at cross purposes to the very reasons for the EIM's existence. There is a better approach that would address the right problem and preserve the critical elements of the existing EIM design.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
,