Article ID Journal Published Year Pages File Type
714111 IFAC Proceedings Volumes 2013 6 Pages PDF
Abstract

We consider the optimal scheduling problem of a single server multiclass fluid flow network with non-negligible setup times. The server is able to serve several queues simultaneously, each at its own rate, independent of the number of queues being served. As performance criteria we consider the weighted average amount of fluid in the queues, also known as work in progress, or we consider the cycle time. Restrictions on cycle time and service times are taken into account. A 4-queue server is presented to illustrate the process of deriving the optimal schedule.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics