Article ID Journal Published Year Pages File Type
715199 IFAC Proceedings Volumes 2013 6 Pages PDF
Abstract

During the project early phase, considering a bidding process (BP), a client makes a request for a work or service to potential providers and then he chooses, by analyzing the responses, the one that will be accepted. From the bidder point of view, there are several risks when responding because he must develop a response based on a future development. Different in nature, these risks can be grouped into different categories. We propose a risk typology throughout the product lifecycle on which we rely to assist the bidder during BP via a methodology for decision support based on the experience acquired during past projects in order to detect, report and minimize the risks in current BP.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics