Article ID Journal Published Year Pages File Type
7158576 Energy Conversion and Management 2018 8 Pages PDF
Abstract
Transient process, an essential condition for the operation of the hydro-turbine governing system, is critical for the safety and stability of a hydropower station. This research focuses on the transient modeling and dynamic analysis of the hydro-turbine governing system in the start-up process. A novel approach is developed to establish the dynamic model of the hydro-turbine governing system in transient process. The flow equation and torque equation were improved to reflect the dramatic changes of system parameters during the start-up process. As a pioneering work, the effect of guide vane opening law on the dynamic characteristics of the hydro-turbine governing system in the start-up process was investigated by numerical simulations. The results of this research can promote the development of transient modeling and performance improvement of hydro-turbine governing systems in transient process.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , , ,