Article ID Journal Published Year Pages File Type
7159294 Energy Conversion and Management 2018 13 Pages PDF
Abstract
A case study was performed with the proposal of the Aripuanã Moveable HEPP in the Madeira River with a 26 ms height dam and a generation capacity of 1400 MW. The increase in generation with the head increaser effect is as high as 21%. The estimated potential for this technology in the Amazon region is 20 GW. Other potential locations are discussed in the article. Dams with head increaser effect have been successfully implemented and have the potential to become a major alternative for base load renewable energy in the future.
Keywords
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , ,