Article ID Journal Published Year Pages File Type
7163583 Energy Conversion and Management 2015 12 Pages PDF
Abstract
Distribution system complexity is increasing mainly due to technological innovation, renewable Distributed Generation (DG) and responsive loads. This complexity makes difficult the monitoring, control and operation of distribution networks for Distribution System Operators (DSOs). In order to cope with this complexity, a novel method for the integrated operational planning of a distribution system is presented in this paper. The method introduces the figure of the aggregator, conceived as an intermediate agent between end-users and DSOs. In the proposed method, energy and reserve scheduling is carried out by both aggregators and DSO. Moreover, Electric Vehicles (EVs) are considered as responsive loads that can participate in ancillary service programs by providing reserve to the system. The efficiency of the proposed method is evaluated on an 84-bus distribution test system. Simulation results show that the integrated scheduling of EVs and renewable generators can mitigate the negative effects related to the uncertainty of renewable generation.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , ,