Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
719043 | IFAC Proceedings Volumes | 2010 | 5 Pages |
Abstract
Total Productive Maintenance (TPM) is a relatively new concept implemented in Romanian enterprises. This paper presents a method to optimize the most important indicator of the TPM concept: Overall Equipment Effectiveness (OEE). A real case study of implementing the proposed method is presented at the end of the paper.
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics