Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
7195076 | Reliability Engineering & System Safety | 2018 | 39 Pages |
Abstract
Enhancing the traditional FRAM approach, the paper presents a structured systemic analysis for a case study in the neurosurgery periâoperative patient's pathway. A multi-layer semi-quantitative framework is used as a basis for a novel decision support tool: the Variability Impact Matrix (VIM). The VIM aids to prioritize corrective measures and the need for functional performance indicators. A combination of social and technical perspectives is confirmed being necessary to cope with complex work environments, such as healthcare practices.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Mechanical Engineering
Authors
Riccardo Patriarca, Andrea Falegnami, Francesco Costantino, Federico Bilotta,