| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 7216538 | Journal of King Saud University - Engineering Sciences | 2018 | 7 Pages |
Abstract
The buffer allocation problem concerning the size and location of storage between the stages of a flow line is a critical research area in the design of production lines. In this study, a production system consisting of two unreliable stages and a buffer between them is considered; the first stage incorporates two identical machines in parallel and the second stage consists of a single machine. A simulation model is designed and used to evaluate the effect of the buffer capacity and the repair rates of machines on production line efficiency. The results revealed the capacity of buffer that yields the maximum production line efficiency with various repair rate values.
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)
Authors
Wadea Ameen, Mohammed AlKahtani, Muneer Khan Mohammed, Osama Abdulhameed, Abdulaziz Mohammed El-Tamimi,
