Abstract
It was found that the improvement of technical and economic performance of the mobile hoisting units can be achieved by increasing their productivity, their massiveness reduction, reconstruction of pull and winding elements, a number of units and hoisting machines parts. However, the increased productivity, in turn, requires increasing the suspended load on the pull elements, enabling the dynamic loadings to increase significantly in elastic elements during the transient operating conditions of the hoisting plant.