Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
7228448 | Water Science | 2017 | 13 Pages |
Abstract
Results show that using the revised approach brings down the cost of mesqa improvement from nearly 10,000LE/fed at present to about 6000LE/fed. These reductions based on the analyses of different mesqa modelling through the adoption of certain parameters such as feasibility of the revised design, effective application of continuous flow for water distribution, and downsizing of the capacity of improved mesqas.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)
Authors
Mohamed Ahmed Saad ElFetyany,