Article ID Journal Published Year Pages File Type
723814 IFAC Proceedings Volumes 2006 6 Pages PDF
Abstract

This paper deals with the problem of task scheduling in a flowshop with two (discrete and batching) machines. Each task has to be processed by both machines. All tasks visit the machines in the same order. The first machine is a discrete machine that can process no more than one task at a time, and the second machine is a batching machine that can process several tasks per batch with the additional feature that the tasks of the same batch have to be compatible. A compatibility relation is defined between each pair of tasks, so that an undirected compatibility graph is obtained which turns out to be an interval graph. The batch processing time is equal to the maximal processing time of the tasks in this batch and all tasks of the same batch start and terminate together. The aim is to make batching and sequencing decisions in order to minimize the makespan.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics