Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
723872 | IFAC Proceedings Volumes | 2006 | 6 Pages |
Abstract
This paper deals with the just in time control of flexible manufacturing systems when reference input is a priori known. The control is based on basic results of residuation in dioid algebra and a local scheduling rule of Early Due Date (to solve possible conflicts).
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics