Article ID Journal Published Year Pages File Type
724247 IFAC Proceedings Volumes 2006 10 Pages PDF
Abstract

For maintaining the reliability of interconnected power systems also in cases of extreme power transits the protective system devices should not become active when ever possible.For this reason, it is necessary to provide for limitation control procedures, and this not only on the side of power plant and system, where it has been common practice for many years to keep at least the main manipulated and controlled variables within their foreseen operation areas, but also within the grid to contain the transmission flows of heavily overloaded system components within their maximum allowable transmission capacity. In this respect, manual short-term bottleneck management on the system operation side turns out to be not sufficient enough, in the case of unexpected events caused by increased power transits.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
, ,