Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
7484572 | Journal of Environmental Management | 2013 | 11 Pages |
Abstract
⺠The effectiveness of rain barrel/cistern and porous pavement are evaluated. ⺠Reduction in runoff, TP, and TN ranged from 2 to 12% due to LID implementation. ⺠Options for retrofitting LID should include 50% rain barrel/cistern or porous pavement. ⺠25% rain barrel/cistern and 25% porous pavement could be another LID option.
Related Topics
Physical Sciences and Engineering
Energy
Renewable Energy, Sustainability and the Environment
Authors
Laurent M. Ahiablame, Bernard A. Engel, Indrajeet Chaubey,