Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
7542478 | Computers & Industrial Engineering | 2014 | 14 Pages |
Abstract
We have developed a method to calculate fuzzy holding and shortage costs and used those as fuzzy cost coefficients in the procurement scheduling model. It minimizes the sum of the above costs under budget constraints and generates optimal ordering schedule. It is applied for procurement scheduling of a real ship building project. Two types of sensitivity analyses were performed: first to understand the effect of variation of degree of uncertainty on total cost and on stage budget requirements and second to study the effect of changes in allocated stage budget parameters on total cost. The results indicate that total cost can be reduced significantly if stage wise budgets are determined considering the uncertainties rather than allocating budget upfront and treating them as constraints. The sensitivity analyses performed, helps in identifying the most sensitive stage of the project and determine the ranges in which stage-wise budgets can be varied.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering
Authors
Vijaya Dixit, Rajiv K. Srivastava, Atanu Chaudhuri,