Abstract

A study is conducted of real PV production from two 100 kWp grid-connected installations located in the same area, both of which experience the same fluctuations in temperature and radiation. Data sets on production were collected over an entire year and both installations were compared under various levels of radiation. The installations were assembled with mono-Si panels, mounted on the same support system, and the power supply was equal for the inverter and the measurement system; the same parameters were also employed for the wiring, and electrical losses were calculated in both cases. The results, in economic terms, highlight the importance of properly selecting the system components and the design parameters for maximum profitability.

► Real PV production from two 100 kWp grid-connected installations is conducted. ► Data sets on production were collected over an entire year. ► Economic results highlight the importance of properly selecting the system components. ► Performance of PV plants is directly related to improvements of all components.

Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , , ,