Abstract

•Integration of all energy-intensive components of a cement plant production process in a simulation package.•Uniquely, the simulation model incorporates constraints such as maintenance, production and dynamic energy costs.•The system was implemented on four different cement plants and a total energy cost saving of 7.1% was achieved.

Energy costs play a major role in the cement production process. As much as 60% of total cost is allocated to energy and 18% to the consumption of electrical energy. Historically, energy cost savings were achieved by large infrastructure upgrades. These upgrades are often costly and lead to interruptions in production. In this paper the operation of all the energy intensive components of the cement production process are identified, modelled, integrated and optimised for minimum operational costs while meeting production targets. This integrated approach allows for simulation of the collective effect of individual production components. The system incorporates constraints such as maintenance, production and dynamic energy costs. No published research could be found where these constraints are incorporated into a single operational solution. The system was implemented on four cement plants and a total energy cost saving of 7% was achieved. This highlights the practical significance of an integrated approach to energy cost savings.

Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , ,