Article ID Journal Published Year Pages File Type
7703703 Ultrasonics Sonochemistry 2017 8 Pages PDF
Abstract
In the solar process, electric consumption accounts for a maximum of 33% of total costs. Thus, for a TOC removal of 80%, the cost of this treatment is about 1.36 €/m3. However, the efficiency of the solar installation decreases in cloudy days and cannot be used during night, so that a limited flow rate can be treated.
Related Topics
Physical Sciences and Engineering Chemistry Chemistry (General)
Authors
, , , ,