Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
7917406 | Energy Procedia | 2017 | 11 Pages |
Abstract
The certification process results, at a first analysis, hard to follow due to the complexity of internal parameters and the documentation required. The paper consists in a methodology and in an univocal work program of LEED O+M, trying to obtain the minimum requested certification score with optimization of the technical resources and documents. This methodology has application in a case study of historic building: the Ca' Rezzonico Museum, in the center of Venice.
Related Topics
Physical Sciences and Engineering
Energy
Energy (General)
Authors
E. Mazzola, T. Dalla Mora, F. Peron, P. Romagnoni,