In 2013 a redesigned solid tungsten divertor, Div-III, was installed in ASDEX Upgrade. In two experimental campaigns more than 2700 plasma discharges with up to 10Â s duration, 110Â MJ plasma heating, and reaching a Psep/R of 10Â MW/m were conducted. Div-III is an adiabatically loaded divertor with tungsten target tiles clamped onto a water cooled structure. The tungsten target tiles were inspected and characterized during the shut-down period in 2014. As a result of the target inspection characteristic modifications of the plasma exposed tiles were detected that were not found during the target qualification in a high heat load test facility. 126 out of 128 tiles reveal deep cracks through the target. A lot of tiles show shallow cracks in the high heat load region and finally protruding tiles with strong local damages were found. It should be noted that none of these target damages have caused an unscheduled opening of ASDEX Upgrade.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Nuclear Energy and Engineering
Authors
A. Herrmann, I. Zammuto, M. Balden, H. Greuner, N. Jaksic, A. Kallenbach, M. Li, R. Neu, V. Rohde, ASDEX Upgrade Team ASDEX Upgrade Team,