Article ID Journal Published Year Pages File Type
8040200 Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms 2015 4 Pages PDF
Abstract
A compact 14C AMS facility manufactured by the National Electrostatics Corporation (NEC) has been installed at Guangzhou Institute of Geochemistry, Chinese Academy of Sciences (GIGCAS). The system is based on a Model 1.5SDH-1 Pelletron accelerator with a maximum terminal volt 0.6 MV. This paper reports the performance and the operation of this machine in the first several months after installation.
Related Topics
Physical Sciences and Engineering Materials Science Surfaces, Coatings and Films
Authors
, , , , , ,