Article ID Journal Published Year Pages File Type
806413 Reliability Engineering & System Safety 2011 20 Pages PDF
Abstract

In 2001, the National Nuclear Security Administration (NNSA) of the U.S. Department of Energy (DOE) in conjunction with the national security laboratories (i.e., Los Alamos National Laboratory, Lawrence Livermore National Laboratory, and Sandia National Laboratories) initiated development of a process designated quantification of margins and uncertainties (QMU) for the use of risk assessment methodologies in the certification of the reliability and safety of the nation's nuclear weapons stockpile. A previous presentation, “Quantification of Margins and Uncertainties: Conceptual and Computational Basis,” describes the basic ideas that underlie QMU and illustrates these ideas with two notional examples. The basic ideas and challenges that underlie NNSA's mandate for QMU are present, and have been successfully addressed, in a number of past analyses for complex systems. To provide perspective on the implementation of a requirement for QMU in the analysis of a complex system, three past analyses are presented as examples: (i) the probabilistic risk assessment carried out for the Surry Nuclear Power Station as part of the U.S. Nuclear Regulatory Commission's (NRC's) reassessment of the risk from commercial nuclear power in the United States (i.e., the NUREG-1150 study), (ii) the performance assessment for the Waste Isolation Pilot Plant carried out by the DOE in support of a successful compliance certification application to the U.S. Environmental Agency, and (iii) the performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada, carried out by the DOE in support of a license application to the NRC. Each of the preceding analyses involved a detailed treatment of uncertainty and produced results used to establish compliance with specific numerical requirements on the performance of the system under study. As a result, these studies illustrate the determination of both margins and the uncertainty in margins in real analyses.

► The National Nuclear Security Administration's mandate for quantification of margins and uncertainties (QMU) is discussed and illustrated. ► Three past analyses of complex systems are used to provide examples of QMU that involve a separation of aleatory and epistemic uncertainty. ► Example 1: probabilistic risk assessment for the Surry Nuclear Power Station. ► Example 2: performance assessment for the Waste Isolation Pilot Plant. ► Example 3: performance assessment for the proposed repository for high-level radioactive waste at Yucca Mountain, Nevada.

Related Topics
Physical Sciences and Engineering Engineering Mechanical Engineering
Authors
, , ,