Abstract
For leased equipment the lessor incurs penalty costs for failures occurring over the lease period and for not rectifying such failures within a specified time limit. Through preventive maintenance actions the penalty costs can be reduced but this is achieved at the expense of increased maintenance costs. The paper looks at a periodic preventive maintenance policy which achieves a tradeoff between the penalty and maintenance costs.