Article ID Journal Published Year Pages File Type
8069242 Annals of Nuclear Energy 2015 7 Pages PDF
Abstract
Once-Through Steam Generator (OTSG) with smaller size and larger heat transfer capability, is typically used for Small and Medium sized Reactors (SMRs). Because the Integrated Pressurized Water Reactor (IPWR) uses OTSG, the feed water is heated to superheated steam by primary coolant, and the higher steam temperature could improve the thermal efficiency of the reactor power plant. However, the smaller size and heat capacity make stable operation more difficult. In this paper, a mathematical model of IPWR is established using RELAP5 code, and a coordination control scheme is used to study the rapid load following characteristics of OTSG. The effects of main operating parameters related to stable operation of OTSG are investigated. Average coolant temperature, steam pressure and OTSG grouping run operation boundary are confirmed. This operation boundary can be used to design and optimize the control system.
Keywords
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,