Article ID Journal Published Year Pages File Type
8070858 Energy 2018 44 Pages PDF
Abstract
Environmental concerns have caused application of renewable energy sources as a clean appropriated alternative for conventional thermal generators in power system planning. These uncertain and variable sources have challenged the power system scheduling to ensure that it still remains reliable and economical. Also, plug-in electric vehicles may potentially alter load demand in uncontrolled charging mode and impose new challenges to the unit commitment problem. This paper demonstrates the fast heuristic method based on priority list to solve the stochastic unit commitment problem and applied it to a basic 10-unit case study system accompaniment with an electric vehicle parking lot, a wind farm and a solar farm over a 24-h time horizon. As it is reported, scenario generation with Monte Carlo simulation can relatively compensate for the intermittent behavior of renewable energy sources and result in more economical and robust planning. Moreover, the integration of plug-in electric vehicles and their controlled charging/discharging is considered. Thermal units are scheduled by priority list method with their relevant constraints such as minimum up/down time, spinning reserve, load demand and capacity limitation. The simulations results verify that the penetration of the mentioned renewable energy sources can improve the operational cost and computation time, effectively.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, ,