Article ID Journal Published Year Pages File Type
8076340 Energy 2014 6 Pages PDF
Abstract
The payback period for the investment in a 500 kW high-temperature heat-pump for exploiting low-temperature heat of the generators' cooling system would be approximately 2 years for the case of heating the commercial buildings of the hydro power plant, and 7 years for the case when heating the fluid within the nearby district heating systems of urban settlements.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , ,