Abstract
The payback period for the investment in a 500Â kW high-temperature heat-pump for exploiting low-temperature heat of the generators' cooling system would be approximately 2 years for the case of heating the commercial buildings of the hydro power plant, and 7 years for the case when heating the fluid within the nearby district heating systems of urban settlements.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Energy (General)
Authors
D. GoriÄanec, V. Pozeb, L. TomÅ¡iÄ, P. Trop,