Article ID Journal Published Year Pages File Type
8089021 Green Energy & Environment 2018 25 Pages PDF
Abstract
Technology readiness level according to the EU commission/Up-Scaling from lab to pilot scale; (a) lab scale module, (b) medium sized module, (c) Multimodule, (d) Membrane Pilot plant. Highlight for graphical content: Biomethane as vehicle fuel from biogas was upgraded in a carbon membrane-based pilot plant process. Applying a single stage separation operation meant a low energy usage; 0.13 kWh/(Nm3 of upgraded biogas). However, the brittleness of hollow fibers remained a challenge.320
Keywords
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , ,