Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
8094508 | Journal of Cleaner Production | 2018 | 48 Pages |
Abstract
Currently, energy consumption reduction is playing a more and more important role in production and manufacturing, especially for energy-intensive industries. An optimal production scheduling can help reduce unnecessary energy consumption. This paper considers an identical parallel machine scheduling problem to minimize simultaneously two objectives: the total energy consumption (TEC) and the makespan. To tackle this NP-hard problem, an augmented É-constraint method is applied to obtain an optimal Pareto front for small-scale instances. For medium- and large-scale instances, a constructive heuristic method with a local search strategy is proposed and the NSGA-II algorithm is applied to obtain good approximate Pareto fronts. Extensive computational experiments on randomly generated data and a real-world case study are conducted. The result shows the efficiency and effectiveness of the proposed methods.
Related Topics
Physical Sciences and Engineering
Energy
Renewable Energy, Sustainability and the Environment
Authors
Shijin Wang, Xiaodong Wang, Jianbo Yu, Shuan Ma, Ming Liu,