Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
8106940 | Journal of Cleaner Production | 2014 | 6 Pages |
Abstract
In the specific case of this Iberian pig slaughterhouse the results show that the most profitable option involves the installation of an anaerobic digestion plant with an electrical power of 79 kWe and a solar photovoltaic installation of 225 kWe. The total cost of both systems is 737,000 ⬠and the project presents a Payback period (PBP) of 9 years, an Internal Rate of Return (IRR) of 9% and a Net Present Value (NPV) of 0.70 millions â¬.
Related Topics
Physical Sciences and Engineering
Energy
Renewable Energy, Sustainability and the Environment
Authors
A. González-González, M. Collares-Pereira, F. Cuadros, T. Fartaria,