8110842 | Renewable and Sustainable Energy Reviews | 2018 | 13 Pages |
Abstract
The results show that advances have reached 70% reduction in installation times throughout the period for the whole set, turbine plus foundation. Most of these improvements (and the corresponding impact in reducing costs) relate to the larger size of turbines installed nowadays. There is, therefore, not any leap forward in the installation process, but only incremental improvements applied to turbines that are now four times as large as in 2000.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Renewable Energy, Sustainability and the Environment
Authors
Roberto Lacal-Arántegui, José M. Yusta, José Antonio DomÃnguez-Navarro,