Article ID Journal Published Year Pages File Type
8120626 Renewable and Sustainable Energy Reviews 2014 10 Pages PDF
Abstract
In this paper, a new methodology for Transmission Expansion Planning (TEP) in deregulated electricity market is presented. The proposed TEP is associated with Reactive Power Planning (RPP), reliability assessment and also consideration of wind and load uncertainties. The proposed planning aims at investment cost minimization, social welfare maximization and satisfying reliability constraint at the same time with taking into account wind and load uncertainties. Expected Energy Not Supplied (EENS) is used as an index for reliability evaluation. At first, Monte-Carlo simulation is used to obtain the Probability Density Function (PDF) of Wind Turbine Generator (WTG) output. Then, the WTG and load uncertainties are considered in TEP formulation. Particle Swarm Optimization (PSO) method is considered to solve the proposed planning problem which is a constrained nonlinear mixed integer optimization programming. Simulation results on two standard test systems (Garver and RTS systems) verify the effectiveness of the proposed planning for consideration of wind and load uncertainties in TEP problem under electricity market environment. Also, the proposed method leads to reduction of the total investment cost, the reliability improvement and the social welfare maximization.
Related Topics
Physical Sciences and Engineering Energy Renewable Energy, Sustainability and the Environment
Authors
, , ,