Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
815804 | Ain Shams Engineering Journal | 2013 | 9 Pages |
Abstract
Surface treatment on the concrete surface using sealers reduces the rate of permeability of chloride and moisture through the concrete. The delaying of onset of corrosion is evaluated for surface treated and untreated concrete using electrochemical techniques. After conducting rapid chloride permeability test (RCPT), using Nernst–Plank equation, the diffusion coefficient of chloride (Deff) is calculated. Substituting threshold chloride concentration of rebar (Cth) from cyclic polarization test in the ficks second law, the time to initiation of corrosion (Ti) is arrived. From the results it is found that the treated concrete with alkyltrialkoxy silane sealer delays the onset of corrosion by four times than that of untreated concrete.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)
Authors
A. Sivasankar, S. Arul Xavier Stango, R. Vedalakshmi,