Article ID Journal Published Year Pages File Type
838609 Nonlinear Analysis: Real World Applications 2010 13 Pages PDF
Abstract

A mathematical model for the optimization of pump scheduling in a water distribution system is proposed. The water system we consider works without a large water storage facility and hence the mass balance principle is the base for the model. A result concerning the pressure drop after TT-junctions is the main simplification we propose. An optimization problem is formulated and solved by a Branch and Bound method for a real water distribution system using data from a small city in Serbia.

Related Topics
Physical Sciences and Engineering Engineering Engineering (General)
Authors
, , , ,