Article ID Journal Published Year Pages File Type
857918 Procedia Engineering 2014 8 Pages PDF
Abstract

An important component of the management cost of aqueducts is given by the energy costs. Part of these costs can be recovered by transforming some of the many existing energy dissipations in electric energy by means of economic turbines. In this study an experimental work has been carried out: 1) to test the performance of an economic Cross-Flow turbine which maintains high efficiency within a large range of water discharges, and 2) to validate a new approximated formula relating main inlet velocity to inlet pressure. It is proved that the proposed formula, according to some simplifying assumption, exactly links inlet velocity to inlet pressure according to any possible geometry of the Cross-Flow turbine.

Related Topics
Physical Sciences and Engineering Engineering Engineering (General)