Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
858102 | Procedia Engineering | 2014 | 7 Pages |
Abstract
This paper presents the project management techniques needed to design the newest four evaporators installed in North America, and any similar project. The four evaporators included integral fluosilicic acid recovery systems, and were successfully designed, fabricated, erected and operational by mid 2009. Topics discussed in the paper include: Project Objectives, Project Stages, Scope Definition, Design Basis, Codes and Standards, Technology Selection, Capital Cost Estimation, Schedule Development and Control, Operating Cost Estimation, Value Improvement Practices, Equipment Specification, Contractor Bid Specification, Constructability Review, Construction Management, and Commissioning.
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)