Article ID Journal Published Year Pages File Type
858413 Procedia Engineering 2014 10 Pages PDF
Abstract

This paper presents predictive discolouration modelling and subsequent field trial results for a cast iron trunk main network. This enabled a UK water company to propose an ‘operational flow conditioning’ maintenance plan that reduces discolouration risk, improves network resilience and asset condition and yet does not require the trunk main to be decommissioned for invasive cleaning. This represents substantial time and cost benefits. Pre-and-post trial turbidity monitoring data is also presented which identified a daily flux of material, a factor in the regeneration of material layers that have been shown to cause discolouration when mobilised. Additional data detecting the occurrence of pressure transients is also presented, a possible cause of contaminant ingress and asset failure.

Related Topics
Physical Sciences and Engineering Engineering Engineering (General)