Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
858495 | Procedia Engineering | 2014 | 6 Pages |
Abstract
Due to geological conditions of the construction, the deep geothermal wells in Leling, Qingyun and other regions, are easy to produce sand and other issues after long-term used, in order to prevent the geothermal wells being destroyed by sand production, based on previous experience of gravel-filling operation in Renqiu and other places, selecting a particle gradation and well structure reasonably can effectively prevents the occurrence of such events, therefore we applied gravel-filling technology in geothermal well drilling, and successfully abtained a good well completion quality
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)