During the construction of the bridge near Štrba village, concrete was needed to achieve the cube strength of 35 N/mm2 after 48 hours to allow the prestressing works. However, the question remained how to practically verify the real strength achieved in the structure after such a short time. Whereas the specimens were cured in accordance with valid standards at 20 °C in water, it was doubtful whether the real strength of the concrete structure, which is hardening at ambient temperatures around 2 °C, corresponds to these measured strengths. It was questionable how to cure the specimens to get as close to the real strengths as possible.